Update
Okumaya devam et...
← Previous revision | Revision as of 05:55, 9 May 2024 |
Line 103: | Line 103: |
In May 2022, the "French Economy Minister [[Bruno Le Maire]] said SALTO and ENLIGHTEN would be operational by 2026", and ArianeGroup stated that the target date was achievable.<ref name=euronews20220507/>{{update after|2022|10|19}}<!-- ff the delay of Ariane 6 first flight to late 2023 per <ref name=sn20221019>, this would give the Ariane 6 a very short operational life --> | In May 2022, the "French Economy Minister [[Bruno Le Maire]] said SALTO and ENLIGHTEN would be operational by 2026", and ArianeGroup stated that the target date was achievable.<ref name=euronews20220507/>{{update after|2022|10|19}}<!-- ff the delay of Ariane 6 first flight to late 2023 per <ref name=sn20221019>, this would give the Ariane 6 a very short operational life --> |
As of May 2022, the SALTO project intended to carry out an initial flight test of a single rocket stage by mid-2024, using a [[Themis programme|Themis]] [[Test article (aerospace)|prototype]] [[First stage (rocketry)|first stage]] to validate the landing phase of the design.<ref name=euronews20220507/> | As of May 2022, the SALTO project intended to carry out an initial flight test of a single rocket stage by mid-2024, using a [[Themis programme|Themis]] [[Test article (aerospace)|prototype]] [[First stage (rocketry)|first stage]] to validate the landing phase of the design.<ref name=euronews20220507/> First hot fire engine testing occurred in 2023.<ref>{{Cite web |last=Simpson |first=Clive |title=First hot-fire test of Europe’s reusable methane-fueled Prometheus rocket engine – Spaceflight Now |url=https://spaceflightnow.com/2023/06/...of-europes-reusable-prometheus-rocket-engine/ |access-date=2024-05-09 |language=en-US}}</ref> |
== Description == | == Description == |
Okumaya devam et...