Overview
Okumaya devam et...
← Previous revision | Revision as of 11:45, 10 May 2024 |
Line 45: | Line 45: |
==Overview== | ==Overview== |
The power station's generation capacity is 25 megawatts. Its output is to be sold directly to SONABEL for integration into the national electricity grid. The design calls for an attached 5 MW/20 MWh [[battery storage power station]] (BESS).<ref name="1R"/><ref name="2R"/> | The power station's generation capacity is 25 megawatts. Its output is to be sold directly to SONABEL for integration into the national electricity grid. The design calls for an attached 5 MW/20 MWh [[battery storage power station]] (BESS).<ref name="1R"/><ref name="2R"/><ref name="3R"/> |
==Funding and timeline== | ==Funding and timeline== |
Okumaya devam et...