No bare URLs. Remove Cleanup bare URLs template
Okumaya devam et...
← Previous revision | Revision as of 07:36, 16 April 2024 |
Line 2: | Line 2: |
{{Use Indian English|date=December 2019}} | {{Use Indian English|date=December 2019}} |
{{one source|date=December 2019}} | {{one source|date=December 2019}} |
{{Cleanup bare URLs|date=August 2022}} | |
{{Infobox power station | {{Infobox power station |
| name = JSW Vijayanagar Power station | | name = JSW Vijayanagar Power station |
Line 37: | Line 36: |
'''JSW Vijayanagar Power Station''' is a coal-based thermal power plant located in Toranagallu village in [[Bellary district]] [[Karnataka]]. The power plant is operated by the [[JSW Energy Limited]]. | '''JSW Vijayanagar Power Station''' is a coal-based thermal power plant located in Toranagallu village in [[Bellary district]] [[Karnataka]]. The power plant is operated by the [[JSW Energy Limited]]. |
The coal for the plant is imported.<ref>{{Cite web |url=http://www.jsw.in/Energy/inner_subpage.php?id=1&mid=2sid=4#projectunderoperations |title=JSW |access-date=20 March 2014 |archive-date=20 March 2014 |archive-url=https://web.archive.org/web/2014032...ge.php?id=1&mid=2sid=4#projectunderoperations |url-status=dead }}</ref> | The coal for the plant is imported.<ref name="jsw">{{Cite web |url=http://www.jsw.in/Energy/inner_subpage.php?id=1&mid=2sid=4#projectunderoperations |title=JSW |access-date=20 March 2014 |archive-date=20 March 2014 |archive-url=https://web.archive.org/web/2014032...ge.php?id=1&mid=2sid=4#projectunderoperations |url-status=dead }}</ref> |
==Capacity== | ==Capacity== |
It has an installed capacity of '''1460 MW''' (2x130, 4x300 MW). The first two units of 130 MW each became operational in year 2000 and other two units of 300 MW each became operational in year 2009.Two more units were set up later as CPP each 300 MW became operational in year 2012 to meet the energy requirement of JSW steel limited.<ref>{{Cite web |url=
Yükleniyor…
www.
| It has an installed capacity of '''1460 MW''' (2x130, 4x300 MW). The first two units of 130 MW each became operational in year 2000 and other two units of 300 MW each became operational in year 2009.Two more units were set up later as CPP each 300 MW became operational in year 2012 to meet the energy requirement of JSW steel limited.<ref name="jsw"/> |
==References== | ==References== |
Okumaya devam et...